OUR PROCESS - STEP 6
process1
Our bedliner is applied at the temperature of 160 degrees Fahrenheit, at pressures up to 2000 psi, and is sprayed to a thickness of 1/8th of an inch.

Within thirty seconds, the lining is dry, and within 1-2 hours you'll be on the road.